오리건주 교통부, 포틀랜드 LED 가로등 프로젝트 완료

LED 조명 응용-뉴스커버

이 게시물을 공유하세요

The Oregon Department of Transportation (ODOT) has completed an $18.9 million streetlight project in which more than 8,000 fixtures were replaced with energy efficient LEDs.

The streetlight conversion program was done in a partnership with renewable energy company Ameresco and replaced high-pressure sodium lighting fixtures across the Portland area. Lighting was also upgraded in 13 tunnels.

The LED streetlights are dark-sky friendly and use 50% less energy than traditional highway lighting, Ameresco says. The overall project will reduce carbon emissions by an estimated 3,500 metric tons a year.

The lights have a lower color temperature compared with previous lighting, which means they won’t have to be replaced for 15 에게 20 영업 윈윈을 달성하기 위해, Ameresco says. The older, high-pressure lights lasted two to four years.

ODOT says the project will save on maintenance costs and is part of its commitment to reduce carbon emissions through renewable technologies.

According to the Climate Group, lighting accounts for up to 5% of the world’s carbon emissions, and public lighting accounts for 20% 에게 40% of a municipality’s electric bill. A switch to LED lighting can cut energy costs by as much as 70%.

Switching to all LED lighting would also save 735 million tons of carbon emissions worldwide, according to the Climate Group, and up to $6 billion in energy costs in the United States alone.

Similar programs as the one in Oregon have taken place across the country. In New York, the Smart Street Lighting NY program has replaced 300,000 streetlights throughout the state with LEDs with a goal to replace at least 500,000 through 2025.

In Chicago, 이상 280,000 streetlights have been converted to LEDS, which will save $100 million in electricity costs over the next 10 영업 윈윈을 달성하기 위해, the city says. Ameresco has also been a part of similar projects in Oregon, helping Medford update 8,000 public lighting fixtures.

ODOT and Ameresco worked to develop a plan that minimized traffic and safety concerns while meeting design standards. Ameresco also worked with Mobility Advisor Committee to complete the project.

Construction began on the ODOT project in May 2020 and was completed in December 2021.

더 많은 탐색

느긋한 기술 훈련

LAIDISHINE 용접 공정 교육

어제, 우리는 모든 기술 팀 및 생산 파트너를위한 LED 조명 용접 교육을 수행했습니다., 모든 직원의 기술을 향상시키고

번개 솔루션의 최신 시장 가격과 이점을 얻고 싶습니다.?

우리에게 라인을 드롭하고 연락을 유지

Factory News-BG02

우리에 대해 알고

우리에 대해 알고 12 우리에 대해 알고, 우리에 대해 알고 “@laidishine.com”.

우리에 대해 알고, 우리에 대해 알고 우리에 대해 알고, 우리에 대해 알고, 제품에 대한 자세한 정보가 있거나 협상된 가벼운 솔루션을 얻고자 하는 경우.

데이터 보호

데이터 보호법을 준수하기 위해, 팝업의 핵심 사항을 검토해 주시기 바랍니다.. 당사 웹사이트를 계속 이용하시려면, '수락'을 클릭해야 합니다. & 닫다'. 당사의 개인 정보 보호 정책에 대해 자세히 알아볼 수 있습니다.. 당사는 귀하의 계약을 문서화하며 개인정보 보호정책으로 이동하여 위젯을 클릭하여 선택을 취소할 수 있습니다..